2014 is almost history..

..only minor assembly required..

These last few months I have been rather occupied with a different sort of kit, the sort that only requires some minor assembly of a few bricks 😉

Anyway, we are now at the stage where the workshop is closed to the elements, the rest of the house is warm, and only minor items like bathroom, kitchen and doors need to be installed.

Of course a major item to get ready is the whole workshop. (I had a bit of a hard time convincing the contractor I needed 20 odd sockets minimum in the garage) I haven´t even tried to explain the need for vacuum/compressed air and general dust collection, and at least a dozen or so good lights. I´ll show him when it is done.